The things people ask before hiring anyone to work on their house — answered plainly, including where the honest answer is "it depends."
Ask Us DirectlyNo. We come out, look at the work, and give you a written estimate at no cost and with no obligation. You're free to take that estimate and compare it against others — we'd encourage it on a large project.
Because a number given without seeing the work is a guess, and guesses have to be padded to be safe. The conditions that drive cost — what's behind the wall, how level the floor is, whether the existing work was done properly — aren't visible from a description. We'd rather spend an hour looking and give you a number we'll stand behind.
Itemized, not a single lump sum. You'll see the pieces separately so you can make real decisions — dropping one element, upgrading another, or phasing part of it to later. A one-number quote hides exactly the information you need to make those calls.
The estimate is what we expect the job to cost based on what we could see. Changes come from two places: things you decide to add or change along the way, and genuine unknowns uncovered during the work — old water damage, wiring that was never right, framing a previous owner modified. Either way you hear about it when it happens, with the cost, before we proceed. Nothing appears for the first time on the final invoice.
For projects with significant material costs, yes — cabinets, countertops, tile, and flooring have to be bought and often ordered well ahead. The specifics are laid out in writing before anything starts. Small handyman jobs generally don't require one.
Sometimes, and sometimes it's the most expensive decision you'll make. A significantly lower bid usually means something is missing from the scope, cheaper materials are assumed, or steps like subfloor prep and waterproofing are being skipped. Compare bids line by line rather than by the total — and if one is far below the others, ask what it doesn't include.
It varies with the season and what's already underway. Small jobs are easier to slot in than large ones. Call and ask — we'll give you a real answer rather than stringing you along, and if we can't serve your timeline we'll say so.
In our experience, three things: material lead times, decisions that haven't been made yet, and genuine surprises found during demolition. The first two are largely controllable — choosing finishes early is the single most effective thing a homeowner can do to keep a project on schedule.
For most projects, yes, and most of our clients do. Expect noise, dust, and periods where a room is unusable. We keep a working kitchen and at least one bathroom available and tell you in advance which stretches will be worst.
Yes. This isn't a business that sends a different subcontracted crew every morning. Specialized trades get brought in where the work calls for it, but the people in your house are consistent and Matt is directly involved.
It depends on the scope and on whether the property is inside Kerrville city limits or in unincorporated Kerr County — the requirements differ. As a general rule, cosmetic work doesn't require a permit, while structural changes and moving plumbing or electrical usually do. We handle the permitting conversation as part of the project and confirm current requirements with the relevant authority for your specific address rather than assuming.
Standard work within a remodel, yes — fixture replacement, rough-in adjustments, adding circuits. Where the work legally requires a licensed specialist, or where a specialist will simply do it better, we bring in that trade and coordinate it as part of the job so you aren't managing schedules between contractors.
That's what the final walkthrough is for. We go through the project together and you list anything that isn't right, however small. Those items get resolved before the job is considered complete. If something surfaces after that, call us — we'd much rather come back and fix it than have you tell your neighbors we didn't.
Containment barriers around the work area, covered floors on the path in and out, and cleanup at the end of each day rather than only at the end of the job. Remodeling is inherently dusty and we won't pretend otherwise — but there's a large difference between contained and uncontained.
Regularly — much of the housing stock around here dates from the 1970s through the '90s, and there are considerably older homes in places like Comfort. Older houses hold more surprises behind the walls, which is precisely why we raise things as we find them rather than quietly absorbing or hiding them.
Yes. See handyman services — and the practical tip there is to batch several small items into one visit, which gets you much better value than calling separately each time.
Call and ask. You'll get a straight answer, even when it's not the one that wins us the job.